creative • integrated • sustainable
Oswego City School District
Oswego, NY

Oswego City School District

Multi-Phase 2018 Capital Improvement Project

Phased improvements to District athletic complexes and other facilities spanning into 2030.

Phase 1 involved minimal site work.

Phase 2

  • New synthetic turf field stadium including 1,500-seat bleachers with press box, concessions, team rooms.
  • 120 vehicle parking expansion, removal and replacement of a portion of a campus roadway.
  • Storm water management.
  • New press box at existing bleachers.
  • Milling and resurfacing of broken-back track.

Phase 3

  • Pavement reconstruction.

Phase 4

  • Track and bleacher removal and replacement with two natural grass fields.
  • Parking lot reconstruction and circulation improvements.
  • Synthetic turf softball and baseball fields with dugouts and batting cages.
  • Pedestrian circulation.
  • Storm water management including chamber system design.

Phase 5

  • Reconstruction of campus roadway, campus fencing replacement.
  • Building entry redesign.
  • District-wide wayfinding improvements.
  • Parking lot reconstruction.
  • Playscape improvements.
  • Tennis court and basketball court reconstruction.
  • Building entry redesign at District Office.
2014 Capital Improvement Project
  • Met with interested parties including administration, coaches, band and community sports groups to brainstorm the needs of the District.
  • Prepared alternate options for review and discussion.
  • Revisions of site development options, including phasing, to make the proposed project achievable.
  • Preliminary review of environmental site mapping regarding wetlands, soils, etc.
  • Completion of SEQR.
Multi-Phase 2008 Capital Improvement Project

Phase 1B

  • Scope of services at Oswego High School included addition of railings to existing staircase at gymnasium, parking improvements, site work for building additions.
  • Wooden retaining walls were replaced with concrete wing walls at the education center.

Phase 2

  • Reconstruction of parking areas, replacement of ramp at building entrance, drainage improvements, and site work for building additions at Oswego Middle School.
  • Site work at four elementary schools included, addition of railings on existing stairways and ramps, pavement replacement, parking reconstruction, sidewalk and curbing replacement to meet ADA standards, resurfacing of tennis courts and replacement of the fencing at tennis courts.