2016 Capital Improvement Project
  • Tennis court replacement and expansion.
  • Reconstruction of parking lot at high school main entrance as well as Lima Primary School.
  • Multipurpose synthetic turf field at the middle school for baseball, softball, lacrosse, and soccer.
  • Playground reconstruction.
  • Parking lot expansion and circulation improvements at the transportation facility.
Multi-Phase 2008 Capital Improvement Project

Phase 1a, completed in 2010

  • Turf replacement and track restoration.
  • Scope of services included removal of natural grass field and installation of synthetic turf, remediation and resurfacing of the track, installation of a bleacher wash down system allowing for hose connection at multiple points throughout the bleachers.

Phase 1b, completed in 2011

  • Infrastructure improvements at the primary school and high school properties.
  • Vehicular circulation improvements at the main high school parking lot.
  • Reconstruction of two natural grass athletic fields, including irrigation on one field, and an emergency access drive.
  • New expanded bus loop and student drop-off with visitor parking at Lima Primary School.
  • Relocated and improved playground area with perimeter fitness path.

Phase 1c, completed in 2012

  • Infrastructure improvements at the elementary, middle and high school properties.
  • Vehicular and pedestrian circulation improvements with new bus loop, student drop-off area, and parking areas at Manor Elementary.
  • Expanded bus loop, improved vehicular circulation with new dedicated exit drive, and improved main entrance at the middle school.