Ultra Pasteurization Plant, DeWitt, NY

  • $600,000 approximate site costs for site work related to the state of the art plant, located on a 20 acre site.
  • Responsible for preparing necessary documentation for Owner to obtain Site Plan Approval.
  • Scope of work also included driveways, parking lot, loading dock, sidewalk, storm water system including storm water management, curbs and landscaping.
  • A gravity sanitary system from municipal system was designed within five feet of the new building.

Main Processing Plant, Syracuse, NY

  • $500,000. construction cost for multiple site work projects associated with plant expansion.
  • Developed design concept to handle vehicular circulation for various plant functions on very tight urban site.
  • Designed heavy duty pavement sections and loading dock pads for multiple types of heavy trucks.
  • Consultant responsible for new storm water system to handle increased run-off.
  • Designed weigh scale to measure bulk milk loads.

 Various Convenience Stores, Syracuse area

  • Designed heavy duty pavement sections and regrading to handle storm water.
  • Improved aesthetic appearance of several stores with landscaping and pavers, etc.
  • Assisted Owner with excavation of sites for new stores.