• Responsible for evaluating numerous site configurations related to various additions to achieve the best solution for the school district.
  • Scope of site work included:  A 400 meter all-weather track, multiple grass playfields, synthetic turf playing field, circulation and parking improvements.
  • Storm water management and realignment of a channelized stream.
  • Subsurface irrigation system for the synthetic turf surface.