Syracuse City School District
2022 Institute of Technology Athletic Facility
- New turf field stadium.
- New multipurpose synthetic turf field.
- 1,000 seat bleachers with press box.
- Sports field lighting and LED scoreboard.
- Playscape adjacent to field and concrete walkways for pedestrian circulation.
- Relocation of subsurface utilities.
- Storm water management.
- Site work for new field house.
- Fencing, netting, goals, lawns, and landscaping.
2021 Nottingham High School
- Replacement of the synthetic turf field.
- Resurfacing of the athletic track.
2020 Corcoran High School
- Athletic facility improvements.
- Removal and replacement of the synthetic turf field.
- Resurfacing of the running track and reconstruction of D-zones.
- Storm drain and trench drain improvements.
- Replacement of field events including rebuilding of shot put and replacement of discus pad, cage, and netting.
2018 Huntington PreK-8 School
- Improvements to pedestrian and vehicular circulation including new bus loop, dedicated parent drop-off, and assigned staff parking.
- Relocated, new playscape and softball field.
- Site work includes erosion control, subsurface storm water management, new pavements, curbing, fencing, lawns, and landscaping.
2016 Henninger High School
- Removal and replacement of the track and synthetic turf.
- Replacement of field events as well as perimeter track trench drain and fencing.
- Drainage improvements.
2010 Additions and Renovations Project
Institute of Technology at Syracuse, completed in 2012
- Responsible for site design associated with the estimated $30 million additions and reconstruction project.
- Scope of services included: SPDES/SWPPP, relocation of building addition and site renovation including bus drop-off, student drop-off, parking, site utilities, fencing, storm water management system, site plantings.
- Project achieved LEED Silver Certification.
H.W. Smith Reconstruction Project, completed in 2013
- Responsible for site design associated with the estimated $30 million additions and reconstruction project.
- Scope of services includes: SPDES/SWPPP, building additions and renovations including student drop-off zone, parking, site utilities, storm water management system.
- Project achieved LEED Silver Certification.