Approximate site costs of $1.5 million for the implementation of the Sustainable Landscape Master Plan.

Phase One, completed in 2010, $1.0 million approximate site construction costs

  • Redesign of the main entry drive and loop road with a three-leg roundabout traffic configuration.
  • Storm water analysis was performed as required by the NYSDEC to acquire the necessary SPDES Permit.
  • Designated bike route along the campus road system.
Phase Two, completed in 2011, $500,000 approximate site construction costs
  • Rain garden to meet requirements and reduce runoff. 
  • Expanded plaza and student gathering space.