• Site design for multiple schools included new drives, parking, sidewalks and storm water management.
  • Multiple athletic field renovations including a synthetic turf with inlaid lines for sports:  Football, soccer and lacrosse.
  • New sodded practice field with irrigation system, as well as a varsity softball field.
  • A comprehensive site phasing plan was prepared in coordination with the building phasing plan to help with teacher and student activities during construction.  The new design included separate parking for faculty and students, a new bus garage and separate bus loop, a new parent drop-off area.
  • Previous site work at the school was completed when two buildings were demolished (a mall and retail store) and included extensive site utilities and a through corridor. 
  • Other site work included field renovations at both the West Genesee Middle School and the Camillus Middle School.

2013 Capital Improvement Project

  • $2.6 million estimated site construction costs for site improvements at multiple district properties.
  • Scope of services at West Genesee High School includes new granite curb and repave the existing bus drop-off loop, replace concrete sidewalk, asphalt path from tennis courts to baseball field, improve field drainage, replace granite curb at turf stadium entry.
  • Scope of services at Camillus Middle School includes front entry enhancements, drainage improvements, new infield at baseball field along with new backstop, fencing, player benches and bleacher pad, new fencing at basketball court along with two new hoops.
  • Scope of services at West Genesee Middle School includes a new parent drop-off loop, repave the existing bus loop, concrete walk replacement, replace basketball hoops, new granite curbs and ADA signage at faculty parking lot, granite curb replacement at north drive and bus loop, parking lot drainage repair and asphalt, correct eroded asphalt edge at entry drive.
  • Scope of services at East Hill Elementary School includes a new playscape with ADA accessibility, regrouting of all granite curb, repair small parking lot, provide new backstops and fencing at softball fields, provide concrete gutter at entry drive, concrete walk replacement.
  • Site work at Onondaga Road Elementary School includes new backstops and fencing at existing softball fields, curbing around electrical vault, walk replacement, and drainage upgrades at ADA playscape.
  • Site work at Split Rock Elementary School includes curb replacement along the bus loop and repairing the walls and columns at the front entry.
  • Site work at Stonehedge Elementary School includes drainage improvements, sidewalk replacement, replace basketball hoops, paved entrance to the existing playscape, granite curb replacement, concrete sidewalk replacement, drainage improvements at the softball field, and a new paved walkway from parking lot to basketball court.
  • Site work at the Transportation Center and District Office includes correcting drainage issues in the parking lots.
  • Project is scheduled for completion in 2015.