• Renovation of the school's existing athletic stadium including installation of a new synthetic turf field within their existing 6x6 lane running track, new track field events, resurfacing resilient track, 200 seat visitor bleachers and renovation of existing tennis courts.
  • Additional site improvements at the high school included site work around new building additions, fire service access road, drainage, parking improvements, memorial garden and plantings.
  • Site work at the new bus garage addition included new pavement, vehicular circulation for buses and bus drivers parking. Site security/fencing improvements and drainage upgrades.

Circulation Improvements

  • Continued professional relationship with this District provided AOLA with award for subsequent project which had $500,000 in site construction costs to evaluate campus drop-off/pickup conflicts and traffic circulation.  The project resulted in the construction of a new parent drop-off loop, main entry road turning lanes, and new ADA stadium/school parking. 
  • Other site improvements included new backstops, fencing and dugouts for two baseball fields and two softball fields.
  • Upgrades to track stadium fencing and gates were also provided.

2014 Capital Improvement Project

  • $1.3 million estimated site construction cost for site work at multiple district sites.

Elementary School

  • Parent/student drop-off and parking lot.
  • Replace concrete sidewalks and curbs.
  • New baseball field backstop.
  • Regrade around building to improve drainage.

High School

  • Access drive improvements.
  • Repave drive to student drop-off/parking lot and repave portion of the bus loop exit.
  • Pavement repair.
  • ADA striping.
  • New long jump runways and pits.
  • Mill existing latex track surface and install new polyurethane surfacing.
  • Improve parking conflict at entry road.

Bus Garage

  • Correct asphalt apron.