Waterville Central School District

2020 Capital Improvement Project
  • Asphalt replacement at bus loop and parking lot.
  • Site work related to a new greenhouse.
  • Sanitary system upgrades.
  • Replacement of synthetic turf field.
  • Site work related to a new fuel island at the Bus Garage. 
2014 Capital Improvement Project

Elementary School

  • Parent/student drop-off and parking lot.
  • Replace concrete sidewalks and curbs.
  • New baseball field backstop.
  • Regrade around building to improve drainage.

High School

  • Access drive improvements.
  • Repave drive to student drop-off/parking lot and repave portion of the bus loop exit.
  • Pavement repair.
  • ADA striping.
  • New long jump runways and pits.
  • Mill existing latex track surface and install new polyurethane surfacing.
  • Improve parking conflict at entry road.

Bus Garage

  • Correct asphalt apron.
  • Install metal bollards at all overhead doors.
2010 Circulation Improvements
  • Evaluation of campus drop-off/pickup conflicts and traffic circulation.  The project resulted in the construction of a new parent drop-off loop, main entry road turning lanes, and new ADA stadium/school parking. 
  • Other site improvements included new backstops, fencing and dugouts for two baseball fields and two softball fields.
  • Upgrades to track stadium fencing and gates were also provided.
2004 Capital Improvement Project
  • Renovation of the school's existing athletic stadium including installation of a new synthetic turf field within their existing 6x6 lane running track, new track field events, resurfacing of resilient track, 200-seat visitor bleachers and renovation of existing tennis courts.
  • Site work around new building additions, fire service access road, drainage, parking improvements, memorial garden and plantings.
  • New pavement, vehicular circulation for buses and bus drivers parking. Site security/fencing improvements and drainage upgrades.