creative • integrated • sustainable
Syracuse City School District
Syracuse, NY

Syracuse City School District

2022 Institute of Technology Athletic Facility
  • New turf field stadium.
  • New multipurpose synthetic turf field.
  • 1,000 seat bleachers with press box.
  • Sports field lighting and LED scoreboard.
  • Playscape adjacent to field and concrete walkways for pedestrian circulation.
  • Relocation of subsurface utilities.
  • Storm water management.
  • Site work for new field house.
  • Fencing, netting, goals, lawns, and landscaping.
2021 Nottingham High School
  • Replacement of the synthetic turf field.
  • Resurfacing of the athletic track.
2020 Corcoran High School
  • Athletic facility improvements.
  • Removal and replacement of the synthetic turf field.
  • Resurfacing of the running track and reconstruction of D-zones.
  • Storm drain and trench drain improvements.
  • Replacement of field events including rebuilding of shot put and replacement of discus pad, cage, and netting.
2018 Huntington PreK-8 School
  • Improvements to pedestrian and vehicular circulation including new bus loop, dedicated parent drop-off, and assigned staff parking.
  • Relocated, new playscape and softball field.
  • Site work includes erosion control, subsurface storm water management, new pavements, curbing, fencing, lawns, and landscaping.
2016 Henninger High School
  • Removal and replacement of the track and synthetic turf.
  • Replacement of field events as well as perimeter track trench drain and fencing.
  • Drainage improvements.
2010 Additions and Renovations Project

Institute of Technology at Syracuse, completed in 2012

  • Responsible for site design associated with the estimated $30 million additions and reconstruction project. 
  • Scope of services included: SPDES/SWPPP, relocation of building addition and site renovation including bus drop-off, student drop-off, parking, site utilities, fencing, storm water management system, site plantings.
  • Project achieved LEED Silver Certification.

H.W. Smith Reconstruction Project, completed in 2013

  • Responsible for site design associated with the estimated $30 million additions and reconstruction project.
  • Scope of services includes: SPDES/SWPPP, building additions and renovations including student drop-off zone, parking, site utilities, storm water management system.
  • Project achieved LEED Silver Certification.