Phase One

  • 8x8 lane all-weather track and field events.
  • Vertically draining natural grass soccer field.
  • Press box and 800+/- seat bleachers.
  • New 50 car parking lot.
  • Rebuilding of six tennis courts.
  • Perimeter access drive and perimeter fencing.
  • Overseeding of existing baseball field.
  • Utilities design including storm water management system.

Phase Two

  • Redesign of middle school entry plaza and adjacent walkways.
  • Redesign of two high school entry plazas and adjacent walkways.