• $2.5 million approximate site construction cost for elementary/high school additions.
  • Responsible for evaluating numerous site configurations related to various additions to achieve the best solution for the school district.
  • Scope of site work included: a 400 meter all-weather track, multiple grass playfields, synthetic turf playing field, circulation and parking improvements.
  • Storm water management and realignment of a channelized stream.
  • Subsurface irrigation system for the synthetic turf surface.
  • Project was completed in 2005.
  • $1.0 million approximate site construction costs for site work related to three building additions at Penn Yan Academy.
  • Scope of services included improvements to existing bus loop and front walkway, drop-off areas, sidewalks, installation of stairs, ramps, access road, parking lot, loading dock, and retaining wall, as well as development of a courtyard area.
  • Site preparation, grading, stormwater management and drainage, circulation improvements, lawns and plantings.
  • Also part of this project was preparation of site sanitary plans and sanitary analysis.
  • Project was completed in 2011.
  • $915,000 estimated site construction cost for additional site renovations.
  • Scope of services includes: five new tennis courts, converting existing tennis courts into parking, and paving of the existing student parking lot.
  • Site plan preparation and site work associated with playscape replacement at the elementary school and installation of visitor bleachers at the athletic facility.
  • Project was completed in 2012.