creative • integrated • sustainable
Indian River Central School District
Philadelphia, NY

Indian River Central School District

2014 Capital Improvement Project

High School

  • Site work included a new 8-lane resilient surface track with synthetic turf field.
  • New field events including pole vault, high jump, steeplechase, long and triple jumps.
  • 1,100 seat bleachers with 32' press box.
  • New support building containing bathrooms and storage.
  • Retaining wall with seating area for visitors.
  • New Black Box theater building addition.
  • New geothermal well system to convert entire building to geothermal energy.

Middle School

  • Renovation of rear parking lot in association with a building addition.
  • New front entrance at middle school and District Office.

Intermediate School

  • New gym and cafeteria additions.
  • Relocated playscape and hardscape areas.

Evans Mills Primary School

  • New front parking lot with bus drop-off area and new sidewalks.
  • Site work associated with building additions.
  • New kindergarten playscape.
  • Sidewalk improvements at multiple primary schools.
Multi-Phase 2008 Capital Improvement Project

Phase One, completed in 2010

  • Scope of work included site work associated with several additions, renovation of the existing track with new triple/long jumps and pole vault, new stairs and handicap accessible walks to track, new storm water drainage, water and sanitary utility work.
  • Site work at elementary schools, including new playgrounds.
  • Landscape Master Plan and large scale plantings to reduce wind, recreate ecological planting patterns within the campus and aesthetically unite the various school buildings and athletic facilities.

Phase Two, completed in 2011

  • New concrete entry plaza with handicap accessible ramps, asphalt service drive and revised storm drainage.

Additional services at the Transportation Center were completed in 2014

  • Expansion of current bus parking lot including an additional 13 chevron style bus parking spaces.
  • Site improvements included grading and storm drainage, concrete gutter, asphalt paving, new line striping and lawn seeding.