• $1.39 million approximate site construction costs for additions and renovations to Delaware Academy High School.
  • Scope of services included:
  • New accessible walkway into the main entrance of the school.
  • Stair, pavement and patio renovations.
  • Storm system repair.
  • Installation of a new resilient surface track (6 lane/8 lane straight)
  • Project was completed in 2004.
  • Additional work at the Delaware Academy was completed in 2011.
  • Scope of work included contract documents related to the removal of the existing bluestone patio in front of the building, which was replaced with textured concrete.

A continued professional relationship with the district allowed Appel Osborne the opportunity to assist with another site improvement project.

  • $1.0 million approximate site construction costs.
  • Paving replacement for bus and vehicular parking and drive lanes.
  • Pedestrian circulation upgrades.
  • Drainage improvements.
  • Track resurfacing.
  • Other Building Condition Survey items.
  • Project was completed in 2014.