• Scope of services:  Survey coordination, storm water management and erosion control measures.
  • Athletic field improvements:  400 meter polyurethane track with bleachers, multiple natural turf competition fields, tennis courts and baseball field.
  • Parking and drive improvements, including the realignment of the roadways, parking and improved circulation.
  • Significant drainage modifications.
  • A well was designed to help with irrigation.
  • Previous site work in phase one related to the building addition and also included storm water management system, sanitary and septic, as well as parking improvements.
  • Project was completed in 2003.

Appel Osborne was given the opportunity to assist with another project at this district.

  • $1.3 million approximate site construction costs.
  • Parking lot renovations including new asphalt, curbs, sidewalk and entry plaza.  Provide drainage improvements and improved circulation upgrades in the parking lot.
  • Resurface running track.
  • Dredge the detention basin and drainage ditches.
  • Seal and restripe the Jr./Sr. High School parking lot.
  • Replace maintenance drive.
  • Prepare Storm Water Pollution Prevention Plan (SWPPP) and State Pollutant Discharge Elimination System (SPDES Permit).
  • Project was completed in 2016.