Site work relating to the renovations at 3 school sites included:

  • Two new softball fields, parking areas and drainage improvements.
  • High school site work included varsity baseball field with masonry dugouts, practice football field, expanded parking and vehicular/pedestrian circulation.
  • An additional property was purchased by the owner, site work included the redesign of the road and parking area, several soccer fields, a softball field.  
  • Coordination with the Army Corps of Engineers for the Storm Water Wetland. Extensive study to develop a storm water management plan to include the off site water coming through the site.
  • Previous site work at the school included road and parking improvements behind the school, a baseball field, as well as pavement, parking and circulation improvements at the elementary and middle school.
  • Front entry memorial walkway with flagpole and new plantings.

2016 Capital Improvement Project

  • $2.3 million estimated site construction cost for athletic facility and site improvements.
  • New athletic track and natural turf field.
  • Consolidation and reconstruction of playgrounds.
  • Drainage improvements.
  • Relocation of softball field displaced by new track.
  • Construction is scheduled to begin in Summer 2018.